ISOLATED GRIDS – GUYANA ENERGY AGENCY

Guyana Energy Storage Container Specifications
With a total capacity of 30 megawatts (MW), the system was shipped in twenty-two (22) containers which comprises of battery racks, six (6) inverters, auxiliary transformers and a fully integrated Power Distribution Center (PDC) shelter. [pdf]FAQS about Guyana Energy Storage Container Specifications
What is Guyana's local content Act 2021?
In December 2022, Guyana's government passed the Local Content Act 2021 for the country's expanding oil and natural gas industry, requiring companies to use local goods, services, and labor in 40 different sectors. The law specifies minimums for local content, ranging from 5% to 100%.
What is Esso Exploration & Production Guyana?
Esso Exploration and Production Guyana, an affiliate of ExxonMobil, operates the Liza 1 field and produces from a floating production, storage, and offloading (FPSO) vessel called the Liza Destiny. The vessel produces more than 120,000 b/d and has a storage capacity of 1.6 million barrels.
How much oil does Guyana have?
Guyana’s total energy consumption and inflation-adjusted GDP per capita, 2012–2022 Guyana had an estimated 11 billion barrels (b) of proved oil reserves as of January 2024. 16 The most significant offshore exploration program started in 2008 when ExxonMobil started collecting and analyzing seismic data, focusing on the Stabroek Block (Figure 4).
How does Guyana generate electricity?
Guyana primarily relies on heavy fuel oil for electricity generation (Figure 9). The vertically integrated, state-owned company called Guyana Power and Light (GPL) controls almost all of the country’s electric power sector.
Does Guyana have onshore resources?
Guyana also has onshore resources. The onshore Guyana Basin boundary extends 150 miles from the coastline into the land.30 The eastern part of the basin has the thickest sediment, reaching up to 8,202 feet.
Where is crude oil produced in Guyana?
Crude oil production in Guyana began in December 2019 in the Liza 1 field, ExxonMobil's first offshore discovery in the country. Esso Exploration and Production Guyana, an affiliate of ExxonMobil, operates the Liza 1 field and produces from a floating production, storage, and offloading (FPSO) vessel called the Liza Destiny.

Guyana Energy Storage Power Station Scale
The GUYSOL initiative, funded by the Guyana/Norway partnership with an estimated investment of US$83.3 million, aims to diversify Guyana’s energy mix. In 2024, the Program is set to install 18 MWp of solar PV farms and battery storage systems in regions 2, 5, and 6. [pdf]FAQS about Guyana Energy Storage Power Station Scale
When did Guyana re-commissioned a power station?
In 1969, the Government of Guyana re-commissioned the station where the power was transmitted to serve the Guyana National Service Camps at Tumatumari and Konowaruk. The development included an embankment dam, a concrete overflow dam, and a 2-unit powerhouse with an installed capacity of 1500 kW using (2 X 750 kW Francis turbines).
How many hydropower sites are there in Guyana?
The hydropower plant will add additional capacity to the grid to meet the town’s growing demand which currently ranges from 2 MW to 3 MW. The following is a summary of 67 potential hydropower sites in Guyana. The following is a list of hydropower studies available at the resource centre of the Guyana Energy Agency.
Is Kato a potential hydropower site in Guyana?
Under the Unserved Areas Electrification Programme, the Hinterland Electrification component, Government of Guyana is currently seeking funding to conduct a feasibility study for the Kato site which has a potential of 3 MW. Below is a map depicting the location of potential hydropower sites in Guyana.
Is Guyana a potential power producer?
The potential power to be produced is intended for export from Guyana to Brazil and in the future as a Phase 2 project to Trinidad & Tobago. An MOU was signed in February 2007 with Guyana Goldfields Inc. for a period of two years to conduct a feasibility study.